arrow.png  HOME     arrow.png  DEALER LOGIN


Fast_Designed.png    twitter-bird-in-a-rounded-square_318-41054.png    facebook-icon-194.jpg   YouTube-logo-full_color.png     

833P

833P and 813P

Key Benefits

Hydraulic Fold Toolbars

IMG_7899_Small.JPG

All 30' or 40' 833P models are equipped with a 7x7 single tube toolbar. While the 60' 813P is equipped with a 4x6 double tube toolbar. At Fast we try our best to equip all our products with as much versatility as possible which is why we have designed all our 40' 833P models to have an external hydraulic fold cylinder so the operator is able to fold the outer wing and have the ability to use the bar at 30' as well.

 

 

 

Powder-coat Paint

IMG_8285_Small.JPG

When you make an investment in equipment, you want it to last, which is why Fast's equipment is all finished with baked-on powder coat paint. Powder coat paint gives equipment great resistance to harsh chemicals, which leads to a longer life and better resale value for you.

 

 

 

 

 

Pump/Toolbar Features

Hydraulic Pumps

IMG_7885_Small.JPG

The Ace 150-206F is the standard pump on 30' and 40' 833Ps. While the standard pump on the 60' 813P is the Ace 205-304F. All pumps that are used on Fast equipment are field proven, durable and sure to have a long lasting life. Standard on all 813P/833P models is the pump hydraulic flow limiter that provides over-speed protection designed to give the pumps a longer lasting life.

 

 

 

 

Hydraulic Fold Toolbars/Wing Kick

IMG_7899_Small.JPG

All 30' or 40' 833P models are equipped with a 7x7 single tube toolbar. While the 60' 813P is equipped with a 4x6 double tube toolbar. At Fast we try our best to equip all our products with as much versatility as possible which is why we have designed all our 40' 833P models to have an external hydraulic fold cylinder so the operator is able to fold the outer wing and have the ability to use the bar at 30' as well. The 833P model is designed to have a trademarked wing kick feature, so when turning the wing will kick up so this will result in less crop damage. This will help prevent crop damage when turning on the headlands.


Toolbar Flex/Gauge Wheels

IMG_7889_Small.JPG

All Fast applicators are designed to have wing flex throughout the entire toolbar. This flex will allow for much better ground penetration and even depth control and fertilizer placement in uneven terrain. The 30' and 40' 833P models come standard with two gauge wheels that help with a more consistent application throughout the entire toolbar. While the 60' 813P comes standard with 4 gauge wheels.

 

 

 

 

Coulters

Coulter_Callout.jpg

Standard on all Fast fertilizer applicators is the heavy duty Clymer coulters. Cylmer coulters are field proven, durable and sure to have a long lasting life, which is why Fast equips all their fertilizer applicators with the reliable Clymer coulter. Coulters can be installed to match your farming operation at any spacing the operator prefers and you can also choose between an injector style or the coulter mounted knife.

 

 

 

 

 

Why Side-Dress?

CAN YOU AFFORD TO TAKE RISKS WITH YOUR NITROGEN?

There has been a lot of discussion on nitrogen timing and the best methods to apply nitrogen. The University of Missouri states it well, “The BMP for timing of nitrogen (N) fertilizer applications is to apply fertilizer as close as possible to the period of rapid crop uptake (Figure 1). Managing N in this way will minimize losses of N from the field and will ensure adequate N availability to the crop during critical growth periods.”

 N_Chart.jpgIn addition, the University of Purdue states that ear size is first determined at V5-V6; “Kernel row number determination of the uppermost ear begins shortly after the ear shoot is initiated (V5 to V6) and is thought to be complete as early as V8.”

Therefore, we know that the primary goals of applying nitrogen is to apply it as close to when your crops need it as possible and also to apply it in a way that will minimize your risk of nitrogen loss to ensure nitrogen is in the soil, available for your crops when they need it.

First let’s take a look at nitrogen timing

  • If you apply all your nitrogen in the Fall you will have around 7 months from when you applied nitrogen to when your crops need it. This seems to be a big gamble and puts you at the mercy of weather to ensure that your nitrogen is still there and available in the Spring. If you get heavy rains in the Fall or Spring, you could lose a very significant portion of your nitrogen through leaching, which is also not as environmentally friendly since this nitrogen has nowhere to escape but deeper into the soil.
  • If you apply all of your nitrogen pre-plant you have cut down on some of your risk of nitrogen loss but you are still applying 1-2 months before your crops need it so there is still some unnecessary risk of nitrogen loss through leaching.
  • If you wait to apply a significant portion of your nitrogen until mid-summer right before the reproductive stage, you may not have all of you nitrogen needs met at V5-V6 when ear size is determined and you may have starved your crops during the early critical growth stages that give a baseline for future yield. In addition, what individuals pushing late-season side dress do not mention is that the microbes and organic matter in your soil contain a significant amount of nitrogen that is naturally released as the soil warms up through the summer.

Therefore, early sidedress strikes the perfect balance between applying your nitrogen just before it is needed by your crops and also ensuring that all of your crops nitrogen needs are met during the critical growth stages.

6.JPGNext, let’s take a look at nitrogen application methods, Dribble vs. Injection

The University of Purdue states that as much as 15-20% of surface applied urea-based nitrogen may volatilize (lost) within a week after application. They also stated that this risk is essentially zero if the product is injected into the soil.

If your nitrogen is applied on top of the soil you are relying on rain to take the nitrogen down to the roots where it is need for uptake. If we have a dry period in the summer, you are subjecting your nitrogen to significant risk of volatilization as it will convert into ammonia gas and escape into the atmosphere, never to be utilized in boosting the yield of your crops.

Injecting your nitrogen in the soil helps reduce this risk of volatilization and helps ensure that the nitrogen that you apply will still be there when your crops need it most.

Our crops are dependent enough upon timely rain, why would we also build this into our Nitrogen Program? Inject your N with a FAST Applicator and minimize this risk!

The University of Purdue sums it up best by stating “One of the keys to managing costs of nitrogen fertilizer or maximizing nitrogen use efficiency is to manage N sources wisely to minimize the risk of nitrogen loss due to leaching, denitrification, or volatilization. The use of a sidedress application strategy remains one of the easiest and least expensive ways to maximize nitrogen use efficiency.”

Invest in your operations with a FAST Applicator to maximize your nitrogen investment and yield by providing a boost of N just before ear size is determined and also minimizing your risk of N Loss by injecting your Nitrogen IN THE GROUND rather than taking an unnecessary risk and dribbling it on top.

Click Here to see Independent Yield Results and ROI - Four Year History showing an average ROI of $63.62 per year per acre through split application and side-dressing from V3-V6.   

References

University of Purdue - https://www.agry.purdue.edu/ext/corn/news/timeless/CornRespLateSeasonN.html

University of Missouri - http://plantsci.missouri.edu/nutrientmanagement/nitrogen/practices.htm

University of Purdue - https://www.agry.purdue.edu/ext/corn/news/timeless/earsize.html

Montana State University - http://store.msuextension.org/publications/AgandNaturalResources/EB0209.pdf

University of Purdue - https://www.agry.purdue.edu/ext/pubs/2006NLossMechanisms.pdf